If, at the moment of handing over the deck or engineering watch, an important operation is being performed it shall be concluded by the __________, except when ordered otherwise by the master or chief engineer officer.
发布于 2021-04-04 22:09:34
【单选题】 A officer being relieved B relieving officer C chief officer or second engineer officer D foreman