The center tank scavenge jet pump operates when:

发布于 2021-02-03 04:39:18
【单选题】
A A.Both Center Tank Fuel Pump switches are turned off.
B B.The No.1 main fuel tank is about 1/2 full and the main tank No.1 forward pump is operating.
C C.The Center fuel tank is about 3/4 full.
D D.Either engine is operating.

查看更多

关注者
0
被浏览
83
  • 体验AI问答!更聪明、超智能!
  • 一款基于GPT的超级AI助手,可以对话、创作、写文案!
1 个回答

撰写答案

请登录后再发布答案,点击登录

发布
问题

手机
浏览

扫码手机浏览

分享
好友

在线
客服