When Ballast Water is taken on board by chief officer,which entries need not to be recorded in the Ballast Water Record Book about this operation ?
发布于 2021-02-23 18:43:07
【单选题】 A Date, time and location port or facility of uptake (port or lat/long) B depth if outside port C Estimated volume of uptake in cubic metres D Signature of the captain