What must be done to an instrument panel that is supported by shock mounts?

发布于 2021-02-18 21:49:23
【单选题】
A Bonding straps must be installed across the instrument mounts as a current path.
B The instrument mounts must be grounded to the aircraft structure as a current path.
C The instrument mounts must be tightened to the specified torque required by the maintenance manual.

查看更多

关注者
0
被浏览
79
  • 体验AI问答!更聪明、超智能!
  • 一款基于GPT的超级AI助手,可以对话、创作、写文案!
1 个回答

撰写答案

请登录后再发布答案,点击登录

发布
问题

手机
浏览

扫码手机浏览

分享
好友

在线
客服