【单选题】
A ?If the time required to operate the mechanism increases with successive operations, it indicates the air is being worked out of the system.
B ?If the time required to operate the mechanism decreases with successive operations, it indicates the air is being worked out of the system.
C ?All hydraulic lines and components should be checked for leaks by applying soapy water to all connections.
查看更多