【单选题】
A Create material-specific source lists for the contract item and set the Exclusion indicator.
B Create material-specific source lists outside the validity period of the contract.
C Create material-specific source lists for the contract item and set the Fix indicator.
D Create material-specific source lists for the supplier and set the Blocked indicator.