Your MRP run detects a shortage of 2000 pieces for a material with an active quota arrangement. Each of your two suppliers can only supply 1000 pieces at once. What must you maintain to have MRP generate a procurement proposal for 1000 pieces for each supplier? Note There are 2 correct answers to this question.

发布于 2021-04-24 03:35:40
【多选题】
A Assign a rounding profile in the material master record of the planned material
B Assign the indicator for quota splitting to the lot-sizing procedure being used.
C Set a maximum quota quantity in the quota arrangement item for each supplier
D Set a maximum lot size in the quota arrangement item and activate the 1xcheckbox