If the forward equipment cooling system is inoperative, each component (WX radar, GPWS and transponder/TCAS) may function for as little as 15 minutes before failing, by using both L and R
side, a total of 30 minutes of operation is possible for each function.
发布于 2021-04-01 12:14:53
- 体验AI问答!更聪明、超智能!
- 一款基于GPT的超级AI助手,可以对话、创作、写文案!