一级机械员机型
送机前绕机检查,对除了()的盖板重点检查
发布于 2021-04-24 23:10:33
【单选题】
A 燃油加油盖板
B 放燃油盖板沉淀
C 滑油勤务盖板
D 加水/排污勤务盖板
查看更多
关注者
0
被浏览
65
体验AI问答!更聪明、超智能!
一款基于GPT的超级AI助手,可以对话、创作、写文案!
👉 点击使用 - AI智能问答 🔥
machi163
2023-04-24
这家伙很懒,什么也没写!
此回答被采纳为最佳答案,开通VIP会员可查看
1
个回答
默认排序
按发布时间排序
撰写答案
请登录后再发布答案,
点击登录
登录
注册新账号
有人回复时邮件通知我
关于作者
色即是空
你要求的次数愈多,你就越容易得到你要的东西,而且连带地也会得到更多乐趣。
提问
1109
回答
947
被采纳
885
关注TA
发私信
相关问题
1
在你的项目的第三个冲刺过半时,开发团队在测试代码时发现了一个严重的问题。他们必须尽快修复这个问题,但这需要的时间超过了他们在当前冲刺中剩余的时间。他们应该怎么做呢?Halfway through the third sprint of your project, the development team discovered a serious problem while testing the code. They had to fix this ASAP, but it took longer than they had left in the current sprint. What should they do?
2
下列对应关闭项次、关闭DE的是
3
在控制项目工作的同时,团队发现进度绩效指数(SPI)为0.8,成本绩效指数(CPI)为0.95。如果该项目的进度计划是优先事项,且没有其他可用资源,项目经理应该做什么?While controlling project work, the team found that the progress performance index (SPI) was 0.8 and the cost performance index (CPI) was 0.95. If the project schedule is a priority and no other resources are available, what should the project manager do?
4
检查试车后的燃油量,应确保左右油箱的油量基本一致,视情保证中央油箱剩余燃油量不多于
5
一个团队对如何解决正在建设中的产品的一个功能有不同的想法,虽然两天前开始冲刺,但他们仍然没有达成共识。项目经理应该怎么做?A team has different ideas on how to solve a feature of a product under construction, and despite starting the sprint two days ago, they still don't have a consensus. What should a project manager do?
6
沙迪是一名Scrum Master,负责跟进一个敏捷项目的团队。团队成员抱怨他们的工作被拖延了,因为新的发起人每次都在询问他们项目的细节。在这种情况下,作为一个Scrum Master,沙迪会怎么做?Shady is a Scrum Master working on a team working on an agile project. Team members complained that their work was delayed because new sponsors were asking them for details of their projects each time. In this situation, what would Shady do as a Scrum Master?
7
页块401-499代表
8
你的项目进行到一半时,产品负责人离开了公司。新的产品负责人被分配到这个项目中,但他来自不同的业务部门。你与新产品负责人一起回顾产品待办事项列表时,他要求重新安排一些积压项目的优先级。你应该怎么做?Halfway through your project, the product owner leaves the company. A new product owner is assigned to the project, but he is from a different business unit. When you review the product backlog with the new product owner, he asks to reprioritize some of the backlog items. What should you do?
9
页块901-999代表
10
301-399勤务,主要位于AMM第()章,这一章主要包括对充灌项目的说明,例如:燃油、滑油、液压油、轮胎压力等